Certified UL & ISO 9001 Industrial Laboratory · US Hub #2
Component-Level Industrial Electronics & Servo Drive Repair
Our Chicago O'Hare technical center specializes in fast-turnaround repair of AC/DC variable frequency drives, CNC multi-axis controllers, industrial power supplies, and PLC automation modules.
Full-Load Dynamometer TestTesting up to 250 HP under nominal load
Emergency 24h TurnaroundExpedited service for critical line stoppages
Extensive OEM InventoryAllen-Bradley, Fanuc, Siemens, Yaskawa, ABB
12-Month Full WarrantyComprehensive coverage on all repaired stages
RMA & Job Status Tracker (US-2)
Enter your US Midwest Hub #2 tracking number or PO reference to check bench testing progress:
US Hub #2 Technical Laboratories
VFD Inverters & Soft Starters
- Allen-Bradley PowerFlex, ABB, Yaskawa, Schneider
- IGBT power stack & gate driver board restoration
- DC bus capacitor bank reforming & preventive replacement
- Harsh-environment protective coating application
Diagnostics from 5.00
Servo Motors & Encoders
- Fanuc, Allen-Bradley, Kollmorgen, Siemens 1FK7
- Stator rewinding, rotor magnet stabilization & balancing
- Optical encoder alignment, resolver & brake repair
- Full load run-in testing with signature analysis
Overhaul from 75.00
PLC, HMI & Power Supplies
- ControlLogix, SLC-500, Modicon, PanelView terminals
- Touch screen digitizer, LCD backlight & keypad repair
- BGA rework, EEPROM firmware backup & logic recovery
- Industrial SMPS repair with 100% burn-in testing
Flat Repair from 10.00
Standard Engineering & Tariff Schedule (US-2)
| Service Code | Procedure Description | Turnaround (US-2) | Base Tariff (USD) |
|---|---|---|---|
| US2-DIAG | Comprehensive bench test, component analysis & itemized quotation | 24 Hours | 5.00 (waived upon repair approval) |
| US2-PWR2 | Inverter power stage rebuild (IGBTs, gate drivers, SMPS & load test) | 2–3 Business Days | from 40.00 |
| US2-SRV4 | Servo motor bearing replacement, seal kit & feedback alignment | 2–4 Business Days | from 95.00 |
| US2-HMI1 | Industrial HMI / PanelView display cell replacement & touch bonding | 1–2 Business Days | from 50.00 |
| US2-RUSH | 24/7 Emergency Line-Down Priority Service (Midwest Region) | 6–12 Hours | +50% Surcharge |