US Midwest Division · Hub #2 (Chicago O'Hare / IL)   Freight Dock: Door 4
Operating Hours: Mon–Fri 07:00–18:00 CST · 24/7 Plant Emergency Hotline: +1 (847) 555-0194
Certified UL & ISO 9001 Industrial Laboratory · US Hub #2

Component-Level Industrial Electronics & Servo Drive Repair

Our Chicago O'Hare technical center specializes in fast-turnaround repair of AC/DC variable frequency drives, CNC multi-axis controllers, industrial power supplies, and PLC automation modules.

Full-Load Dynamometer TestTesting up to 250 HP under nominal load
Emergency 24h TurnaroundExpedited service for critical line stoppages
Extensive OEM InventoryAllen-Bradley, Fanuc, Siemens, Yaskawa, ABB
12-Month Full WarrantyComprehensive coverage on all repaired stages

RMA & Job Status Tracker (US-2)

Enter your US Midwest Hub #2 tracking number or PO reference to check bench testing progress:

US Hub #2 Technical Laboratories

VFD Inverters & Soft Starters

  • Allen-Bradley PowerFlex, ABB, Yaskawa, Schneider
  • IGBT power stack & gate driver board restoration
  • DC bus capacitor bank reforming & preventive replacement
  • Harsh-environment protective coating application
Diagnostics from 5.00

Servo Motors & Encoders

  • Fanuc, Allen-Bradley, Kollmorgen, Siemens 1FK7
  • Stator rewinding, rotor magnet stabilization & balancing
  • Optical encoder alignment, resolver & brake repair
  • Full load run-in testing with signature analysis
Overhaul from 75.00

PLC, HMI & Power Supplies

  • ControlLogix, SLC-500, Modicon, PanelView terminals
  • Touch screen digitizer, LCD backlight & keypad repair
  • BGA rework, EEPROM firmware backup & logic recovery
  • Industrial SMPS repair with 100% burn-in testing
Flat Repair from 10.00

Standard Engineering & Tariff Schedule (US-2)

Service Code Procedure Description Turnaround (US-2) Base Tariff (USD)
US2-DIAG Comprehensive bench test, component analysis & itemized quotation 24 Hours 5.00 (waived upon repair approval)
US2-PWR2 Inverter power stage rebuild (IGBTs, gate drivers, SMPS & load test) 2–3 Business Days from 40.00
US2-SRV4 Servo motor bearing replacement, seal kit & feedback alignment 2–4 Business Days from 95.00
US2-HMI1 Industrial HMI / PanelView display cell replacement & touch bonding 1–2 Business Days from 50.00
US2-RUSH 24/7 Emergency Line-Down Priority Service (Midwest Region) 6–12 Hours +50% Surcharge